Signal clearing Rule of Railway correction 1/19
GRS correction memo no.1/ 2019 1. Substitute the following for GR 1.01 GR 1.01 short title and commencement:- (i) These rules may be called the Indian railway (open line) general amendment rules 2018. (ii) They shall come into force on the date of their publication in the official gazette. 2. Substitute the following for GR 1.02 (5)(i) SR 1.02 (5) (i) The principal chief operations manager is the authorised officer for the southern Railway. 3. Substitute the following for GR 1.02 (31) GR 1.02 (31) "intermediate block post" means a class 'C' station on a single line or a double line or multiple line remotely controlled from the block station in rear. 4. Substitute the following for 1.02(32) GR 1.02 (32) "intermediate block signalling" means an arrangement of signalling on single line or double line or multiple line in which is long blocks section is split into two portion each constituting a separate block section by providing an intermediat...